Funções da vaga
Duties may include: Measure and lay out fence lines and mark posthole positions, following instructions, drawings, or specifications. Dig postholes, using spades, posthole diggers, or power-driven augers. Set metal, wooden, vinyl posts in upright positions in postholes. Align posts, by lines or sighting, and verify vertical alignment of posts, using plumb bobs or spirit levels. Mix and pour concrete around bases of posts, or tamp soil into postholes to embed posts. Stretch wire, wire mesh, or chain link fencing between posts, and attach fencing to frames. Attach fence rail supports to posts, using hammers and pliers. Attach rails or tension wire along bottoms of posts to form fencing frames. Assemble gates, and fasten gates into position, using hand tools & other related Fence Installer activities as per SOC/OES 47-4031 (onetonline.org). Standard/Expected Schedule: Monday-Friday 6:30AM-3:00PM. Offering 40+ (plus) hours per week; not including applicable lunch and/or breaks. Possible weekend/holiday work. Start/end times, offered hours and/or overtime could vary as they may be dependent upon other factors such as project/schedule/service needs, weather, and commute time between worksites (if applicable). Overtime possible, but not required or guaranteed. At Employer’s sole discretion: possible raises and/or bonuses based on individual factors such as work performance or skill (not guaranteed).
Quer se candidatar a esta vaga? 🇺🇸
Crie uma conta grátis (usuário e senha, sem cartão), monte seu perfil e, com um plano ativo, envie sua candidatura direto pelo seu Gmail em poucos cliques.
Criar conta grátis